We are proud to be part of your success

AMS supports material files for FDI medical plants
Share

AMS supports material files for FDI medical plants

The AMS team prepares bilingual Vietnamese–English technical documentation for every material code, helping foreign-invested medical device plants significantly shorten the time needed to evaluate and approve a new supplier.

In the medical device industry, selecting a material that meets requirements is only half the job. The other half is proving its origin, consistency and traceability to the quality department and regulatory authorities. That is why AMS has built a dedicated documentation preparation process for this customer group.

Why material documentation is a bottleneck for FDI plants

Most FDI medical device plants operate under an ISO 13485 quality management system, along with specific requirements from their parent company. Every material that comes into direct or indirect contact with the product, such as needle bonding adhesives, sensor fixation tapes or UV adhesives for catheter assembly, must have a complete documentation package before it can be added to the approved supplier list.

When documentation is incomplete or available only as scattered English-language files, the evaluation process can drag on for months, slowing down efforts to localize the supply chain.

The documentation package AMS prepares for each material code

Depending on each customer's requirements, AMS compiles and cross-checks documents from the manufacturer, and translates the summaries into Vietnamese so that in-house engineers can reference them easily:

  • Technical data sheets (TDS) and safety data sheets (SDS) in GHS format.
  • Biocompatibility certifications to ISO 10993 or USP Class VI, where published by the manufacturer.
  • RoHS and REACH compliance declarations and the Substances of Very High Concern list.
  • Certificates of analysis (CoA) for each lot, including lot number and expiration date.
  • Product change notifications (PCN) and a commitment to give advance notice before the manufacturer changes a formulation.

Working with the quality department

AMS assigns an application engineer as the point of contact, who helps answer supplier evaluation questionnaires, supports on-site warehouse audits and provides samples for IQ, OQ and PQ process validation tests. Every shipment delivered to a medical device plant is documented with traceability back to the manufacturer's production lot.

Medical device customers are not just buying a tube of adhesive; they are buying the certainty that next month's tube will be exactly the same as this month's. Clear documentation is how we prove it. — AMS Application Engineer

Results for the plant

With documentation packages prepared in advance, many supplier evaluations have been shortened from several months to just a few weeks. In-house engineers can prepare material change documents more proactively, while the purchasing department gains additional domestic sourcing options with short lead times.

Beyond the initial documentation, AMS also maintains a tracking list of the material codes supplied to each medical device plant. When a manufacturer announces a change in production site, packaging or raw materials, customers are notified early so they have time to assess the impact.

If your plant needs to add material suppliers for a medical device production line, contact AMS Vietnam for advice on the right documentation package.

Developing a power board, sensor or LED module that needs protection? Send us the operating conditions and AMS will propose suitable materials and samples.

Related news

Get a quote

Leave your details and the AMS team will contact you with advice and a quotation as soon as possible.

Email Call now